The establishment of a centralized steel bar processing plant for the construction of the Guangyuan-Nanchong section of the Lanzhou-Haikou National Expressway project was driven by various challenges faced during the construction process. These challenges included the pressure of increasing production scale, material wastage, low equipment utilization, insufficient utilization of management personnel and special talents, and difficulties in security control and management. To address these issues, the project department proposed the concept of establishing a centralized steel bar processing plant, aiming to optimize production processes, reduce waste, enhance efficiency, and ultimately maximize project profitability.

The main methods employed for building the centralized steel bar processing plant involved:

  1. Standardized Management Concept:
    • Implementing standardized and standardized project management practices to ensure quality and efficiency in construction operations.
    • Establishing refined management practices across various aspects of project execution, including personnel management, cost control, and material management.
  2. Institutional Systems Establishment:
    • Developing and implementing comprehensive specifications, standards, and processes to guide cost control and quality management efforts.
    • Formulating scientific cost control processes and integrating various cost management activities to enhance cost control effectiveness.
  3. Sound Management Organization:
    • Establishing a structured organizational framework with clear roles and responsibilities to facilitate efficient operations.
    • Strengthening the management of construction personnel through reasonable division of labor, talent cultivation, and implementation of effective assessment and incentive mechanisms.
  4. Layout of the Processing Plant:
    • Designating specific areas within the processing plant for raw material storage, processing, and semi-finished product storage to streamline production processes.
    • Implementing standardized signage and layout to enhance operational efficiency and safety.
  5. Construction Personnel and Equipment Configuration:
    • Assigning personnel roles and responsibilities, including a project manager, technical supervisor, safety officer, and operating workers.
    • Equipping the processing plant with necessary machinery and equipment, such as cranes, bending machines, cutting machines, and welding equipment, to support production operations.
  6. Production and Transportation Capacity:
    • Determining the production and transportation capacity based on project requirements, with provisions for scalability to accommodate changes in construction progress.
    • Ensuring that the processing plant can meet the daily production needs of the project while maintaining flexibility to adapt to evolving circumstances.
  7. Management Methods:
    • Establishing and refining management objectives, mechanisms, and processes to ensure safe and efficient production operations.
    • Implementing process controls for steel bar processing, including production planning, quality control, and waste reduction measures.
    • Strengthening supervision and quality control to prevent non-conformities and ensure product quality.

Overall, the establishment of a centralized steel bar processing plant enabled the project department to overcome various challenges associated with decentralized processing methods. By implementing standardized management practices, optimizing production processes, and enhancing quality control measures, the project was able to achieve greater efficiency, reduce waste, and maximize profitability.